Name
Adventist Health
The computing load placed on an aging IBM AS/400 model 730 caused response times to swell, so a powerful new IBM System i model 570 was acquired to take its place. All of the healthcare facilities supported by this system operate on a 24/7 basis, with Adventist employees accessing and updating patient charts continuously. A conventional migration from the AS/400 to the new System i model 570 was going to result in an unacceptable amount of downtime—potentially more than 20 hours.
Read More
Cross IT Services and Solutions, LLC
Server migrations and system upgrades are two of the many tasks that Cross IT performs for its clients. Doing this in a complicated computing environment that lacks complete documentation can be problematic. Consequently, Cross IT needed a data migration tool that allowed it to perform migrations quickly and cost-effectively in an unlimited number of environments. Double-Take Move allowed Cross IT to perform migrations with a fraction of the labor and time normally required.
Read More
Nebraska Furniture Mart
Nebraska Furniture Mart needed to switch from HP blade servers to Cisco UCS blade servers at the same time as it migrated from a VMware environment to Hyper-V. The challenge was finding a way to migrate between different hardware and from VMware to Hyper-V with minimal disruption to the business and without requiring a significant investment of staff time and training.
Read More
Raven Transport
Raven Transport is a growing company. Consequently, it needed to upgrade it's IBM® Power 520 Model M25 server. At the same time the company wanted to upgrade the operating system from V5R3 on the old machine to V5R4 on the new server. Because it runs a lean IT department, Raven Transport needed some assistance in performing the migration quickly and seamlessly, with little or no downtime.
Read More